1. Project Overview
- Client: Baidoa local government and supporting aid organizations.
- Location: Dr. Ayub Stadium, Baidoa, Somalia.
- Completion Date: 2021.
- Scope: Turnkey project encompassing the entire installation of indoor and outdoor grandstands for a capacity of 700 people.
2. The Challenge
Building high-quality infrastructure in post-conflict regions like Baidoa presents unique obstacles. The main challenges for this project included:
- Harsh Environmental Conditions: The grandstands needed to withstand extreme heat and UV radiation. Standard materials would degrade quickly, jeopardizing the longevity and safety of the installation.
- Logistical Complexity: Transporting materials and specialized equipment to a landlocked city in Somalia required careful planning and coordination to ensure timely delivery and installation.
- Safety and Durability: In a region with a history of instability, the final structure needed to be exceptionally safe, durable, and resistant to damage from external factors and corrosion.
- Turnkey Requirement: The client required a full-service solution, including design, engineering, and installation, which placed the onus on our team to deliver a finished, ready-to-use product.
3. The Solution: Our Expertise in Action
Our team delivered a custom, high-quality solution tailored to the project’s specific needs:
- Specialized Material Selection: We specified and used materials with high UV resistance and long-term color retention, ensuring the grandstands would not only endure the local climate but also maintain their appearance for years to come.
- Robust Engineering and Design: Our engineers performed detailed structural calculations for static loads, wind loads, and live loads to ensure maximum safety and structural integrity.
- Professional Assembly Team: Our trained and professional assembly team was deployed to the site, executing the steel construction and seating installation with precision and efficiency.
- End-to-End Project Management: By managing the project as a turnkey solution, we streamlined the entire process from start to finish, from initial ground preparation and infrastructure fixing to the final installation of seating.
4. Results and Impact
The successful completion of the Dr. Ayub Stadium grandstand installation delivered significant outcomes for the client and the local community:
- Enhanced Spectator Experience: The new, robust grandstands provided comfortable and safe seating for 700 spectators, greatly improving the fan experience at the stadium.
- Community Hub: The project contributed to the revitalization of the stadium as a central community hub for football and other events, reinforcing its role in local peacebuilding efforts.
- Symbol of Progress: The durable and modern installation stands as a tangible symbol of development and stability in the region, honoring the legacy of Dr. Ayub.
- Client Satisfaction: Our turnkey approach and professional execution resulted in a high-quality finished product that met all client requirements and demonstrated our expertise in overcoming complex construction challenges.
5. Technical Specifications
- Project Type: Turnkey Grandstand Installation
- Capacity: 700 seats
- Structure: Steel construction
- Materials: High UV-resistant and corrosion-resistant materials
- Included Services: Infrastructure preparation, steel assembly, seating installation, and engineering calculations.
6. Testimonial
- [Insert a quote from a representative from the local government, a sports official, or a community leader discussing the impact of the new grandstands and the professionalism of your company’s work.]
7. Conclusion
The Dr. Ayub Stadium grandstand project is a testament to our company’s ability to deliver high-quality, durable, and context-sensitive construction solutions, even in the most challenging environments. By focusing on smart material selection and professional project management, we delivered a successful project that not only met but exceeded expectations, leaving a lasting and positive impact on the community.


